Which of the following is an use of BIM in project life cycle?
Which of the following is an use of BIM in project life cycle?
The minimum depth of building foundation on
The minimum depth of building foundation on
Which of the following is not a future potential of BIM?
Which of the following is not a future potential of BIM?
What is the foundation for building design, construction, and operations optimization?
What is the foundation for building design, construction, and operations optimization?
What is the Building Information Model (BIM) ?
What is the Building Information Model (BIM) ?
What are the advantages of 3D BIM?
What are the advantages of 3D BIM?
For pile driving near the existing buildings piles preferred as
For pile driving near the existing buildings piles preferred as
Stone missionary is not used in making building
Stone missionary is not used in making building
Which of the following Modeling can not be done through BIM ?
Which of the following Modeling can not be done through BIM ?
If the depth of foundation is less than or equal to its width; foundation is terminated as
If the depth of foundation is less than or equal to its width; foundation is terminated as
Open test pit is only suitable upto a depth of
Open test pit is only suitable upto a depth of
The appointment of a -------- is one of the initial steps in implementing BIM
The appointment of a -------- is one of the initial steps in implementing BIM
What is full form of BIM?
What is full form of BIM?
Which one of the following has the highest coefficient of absorption?
Which one of the following has the highest coefficient of absorption?
Building + Information + modelling = ?
Building + Information + modelling = ?
Which of the following modelling can be done throught BIM?
Which of the following modelling can be done throught BIM?
To gain the most benefits from BIM, it is customary to involve as many -------------- as possible in the early design stages
To gain the most benefits from BIM, it is customary to involve as many -------------- as possible in the early design stages
The minimum depth of foundation for bulidings in clay is
The minimum depth of foundation for bulidings in clay is
Which of the following information can be generated through BIM?
Which of the following information can be generated through BIM?
What is BIM?
What is BIM?
What is the benefit of using BIM technology for designers, engineers and architects?
What is the benefit of using BIM technology for designers, engineers and architects?
The type of roof which slopes in two direction with a break in the slope on each side is known as
The type of roof which slopes in two direction with a break in the slope on each side is known as
A combined Building Information Model that has been complined by amalgamating several different models into one, is called---------
A combined Building Information Model that has been complined by amalgamating several different models into one, is called---------
BIM software is considered to be a(n)-------- modeling software
BIM software is considered to be a(n)-------- modeling software
Which of the following is not an element of BIM?
Which of the following is not an element of BIM?